10с-7-3Э
BuyProduction according to TR 2913-001-15365247-2004
Installation place: as a rule, the valves are installed on the cooling water injection
pipelines in DS, PRDS, FRPRDS and industrial pipelines.
Installation requirements: the valves are designed for outdoor installation and in
closed premises with the ambient temperature up to +70 С.
The valves equipped with built-in actuators shall be only installed on horizontal
pipeline sections with the actuator position upwards.
Pipeline connection: welded connection.
Climatic version: У, УХЛ, ХЛ, Т according to GOST 15150-69.
Placement category: 1, 2, 3 according to GOST 15150-69.
Depending on the lifting height of the valve needle, the throughput capability is
shown in the diagrams.
D, mm: | 20 |
D1, mm: | 32 |
L, mm: | 160 |
H, mm: | 821 |
h, mm: | 775 |
DN - Nominal Diameter PN - Nominal Pressure P - Pressure |
Tmax - Maximum Design Temperature Mкр - Spindle Torque t - Response time μ - Fluid Flow Coefficient |
h - Valve Stroke Kv - Throughput Capability F - Seat Area ζ - Resistance Coefficient |